Wiredja Online News Logo

WiredJa Online News

Wiredja Online News Logo

WiredJa Online News

Work Progressing on Santa Cruz Water Supply

Improvement works on Phase 1B of the Santa Cruz Water Supply System, which will see some 4.4 kilometres of pipeline laid from the town of Santa Cruz to Lovely Point in the parish of St. Elizabeth, is moving apace and should be completed on scheduled in December.

Prime Minister reiterates NWC drought mitigation measures

Prime Minister Portia Simpson-Miller has reiterated the drought mitigation measurtes being pursued by the National Water Commission and the Ministry of water, and have called on the population to cooperate in an effort to reduce waste and maximize the available resources.
Subscribe to this RSS feed